PLM Services - PLM Project Experience
Windchill Special Projects (Performance Tuning, Best Practices, etc)
Rheem Manufacturing (Graco) USA 2007 (Hi-Tech Manufacturing)
This is a special project executed by Sconce in USA – on performance tuning of Windchill PDMLink system.
The performance tuning and best practices recommendations carried out by Sconce resulted in over 200% improvements on the system’s usage. More importantly, the users immediately started liking the system as it became easy to use with much lesser waiting time between commands.
| Achievement: |
Sconce consultant earned excellent appreciation of taking up a highly challenging task and coming out very successful by increasing the performance by over 200%. |
|
Turbomeca – SAFRAN Group, France 2006 (Hi-Tech Manufacturing)
This is another special project executed by Sconce – on performance tuning of Windchill PDMLink system.
The tuning done by Sconce resulted in over 100% improvements on the system’s performance. This project was more challenging as it involved a heavily customized solution on Windchill Foundation. The system is a large installation supporting over 1000 users.
| Achievement: |
Sconce consultant earned excellent appreciation from the customer and PTC for taking up a highly challenging task and coming out very successful by increasing the performance by over 100%. |
|
STATS ChipPAC, Singapore 2005 (Hi-Tech Electronics)
Customization of Engineering Change Order process based on Windchill 626. The solution allows the customers to create ECO for Design Documents and submit from anywhere in the world. The ECO carries the change request details and the change management lifecycle is managed through customized Windchill Workflow. The whole product lifecycle has 15 states with over 100 activities and 50 expressions.
| Tools Used: |
Rational ROSE Modeler 2000, Visual Café 4.5 Apache Web Server, Tomcat Servlet Engine |
| Windchill: |
Clustered Configuration of Windchill Method Servers |
| Achievement: |
Sconce consultants showed high professional commitment to complete the project even after major changes of requirements from the customer. |
|
Back |